Investigating the effect of canal treatment on the wastewater refining facilities
No Thumbnail Available
Date
2017
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Desalination Publ
Access Rights
info:eu-repo/semantics/closedAccess
Abstract
In this study, all wastewater transport and treatment systems in Istanbul are discussed in detail. Collector Collecting (Storage) Capacity of the large wastewater canalization systems was investigated by considering the length and diameter of the collectors. The active capacity of the large-scale collectors that feed the whole refining facility was defined. The facilities and the feeding lines whose active capacity rates are more than 45% (active capacity/project capacity rate) are evaluated. Standby duration usage capacity of collectors for time-based situations when the standby exceeds 70% was subjected to the correlation. The collector lines and regions whose standby duration is over 5 h were determined. The gradient, gas generating status and current land status of the collectors that feed the facility were determined by considering the residential areas, and the Biological Wastewater Treatment Facilities on the collector lines and the collectors with appropriate ventilation systems (chimney, etc.) were taken into evaluation. In particular, one of the branches of Tuzla collector was used in our research and practice. The process of the impacts of the current flow conditions of the canal line on Tuzla wastewater treatment facility was examined. The results of the canal treatment on the wastewater in Istanbul were discussed in more detail.
Description
Keywords
Wastewater treatment, Pumping, Water aqueduct, Tuzla
Journal or Series
Desalination and Water Treatment
WoS Q Value
Q3
Scopus Q Value
Q3
Volume
67