Investigating the effect of canal treatment on the wastewater refining facilities

No Thumbnail Available

Date

2017

Journal Title

Journal ISSN

Volume Title

Publisher

Desalination Publ

Access Rights

info:eu-repo/semantics/closedAccess

Abstract

In this study, all wastewater transport and treatment systems in Istanbul are discussed in detail. Collector Collecting (Storage) Capacity of the large wastewater canalization systems was investigated by considering the length and diameter of the collectors. The active capacity of the large-scale collectors that feed the whole refining facility was defined. The facilities and the feeding lines whose active capacity rates are more than 45% (active capacity/project capacity rate) are evaluated. Standby duration usage capacity of collectors for time-based situations when the standby exceeds 70% was subjected to the correlation. The collector lines and regions whose standby duration is over 5 h were determined. The gradient, gas generating status and current land status of the collectors that feed the facility were determined by considering the residential areas, and the Biological Wastewater Treatment Facilities on the collector lines and the collectors with appropriate ventilation systems (chimney, etc.) were taken into evaluation. In particular, one of the branches of Tuzla collector was used in our research and practice. The process of the impacts of the current flow conditions of the canal line on Tuzla wastewater treatment facility was examined. The results of the canal treatment on the wastewater in Istanbul were discussed in more detail.

Description

Keywords

Wastewater treatment, Pumping, Water aqueduct, Tuzla

Journal or Series

Desalination and Water Treatment

WoS Q Value

Q3

Scopus Q Value

Q3

Volume

67

Issue

Citation